Building

Construction plan

The general contractor is Grand Ehitus OÜ.

The building was designed by Apex Arhitektuuribüroo OÜ.

 

Construction start July 2023
Construction period  July 2023 – December 2024
Handover of homes to clients Januay 2025

Thematic break

Constructions

External walls:
External walls:
Reinforced concrete panels and frame system
Walls between apartments:
Walls between apartments:
Reinforced concrete wall panels and double gypsum framework
Apartment interior walls:
Apartment interior walls:
Plasterboard walls
Ceilings:
Ceilings:
Concrete cavity panels and monolithic reinforced concrete
Roof:
Roof:
Rolled covering protected by greenery
Windows:
Windows:
Wood-aluminium windows
Thematic break

Utilities

Heating system:
Heating system:
Central heating
Ventilation:
Ventilation:
Apartment-based forced ventilation with heat recovery
Energy efficiency:
Energy efficiency:
Energy class B
Water supply and sewerage:
Water supply and sewerage:
Central water supply and sewerage, remote water meters
Electricity and low current:
Electricity and low current:
Electricity and low current panel in the apartment
Thematic break

Other necessities

Underground level car parking spaces
Underground level bicycle parking
Children’s playground

Contact us

Contact our sales partner